Multilogic
  • About Us
    • Our Company
    • Our Team
    • Our Customers
    • World Citizen
    • Contact Us
  • Products
    • Specials
    • Lighting >
      • LED Ceiling Mounted
      • LED Wall Mounted
      • LED Recessed
      • LED Exterior
      • LED Parking Garage
      • LED Lamps
      • Lighting Information >
        • Light Levels
        • In-Suite & Common Area
        • Underground Parking
        • Exterior
        • Exit Signs
        • LED
    • Controls >
      • In-Suite Temp Controls and Monitoring
      • Lighting Controls
  • Services
    • Incentive Processing
    • Engineering & Design
    • Audits
    • Project Installations
  • FAQs
    • Frequently Asked Questions
    • Case Studies
    • Tech Talk
  • Residents
    • Energy Saving Tips >
      • Lighting Tips
      • Heating Tips
      • Cooling Tips
      • Water Tips
      • Large Appliance Tips
      • Small Appliance Tips
      • Electronics Tips

CASE Studies

Picture

TORONTo HYDRO & MULTILOGIC CASE STUDY: UNDERGROUND PARKING & BUILDING  CONTROLS

The Savoy Plaza property had implemented energy efficient (CFL) fixtures for insuite and (T8) underground parking. Common areas including stairwells, hallways, and laundry rooms had not been updated. In addition, the customer wanted to add lighting controls (motion and photocell sensors) to maximize energy savings.
More

Picture

Siteline Group (607 - 611 Heritage)
Goes Green

Located in the beautiful area of Kitchener these properties offered an opportunity to significantly lower utility/electrical costs within the common areas and in-suite units.
More

Picture

Siteline Group (191 Silvercreek)
Goes Green

Located in the downtown core of Guelph ON, this property is minutes from hwy 6 access to 401. This property offered an opportunity to significantly lower utility/electrical costs within the common areas and in-suite units.
More
Picture

Siteline Group (550 Westmount)
Goes Green

Located on Westmount Road in a park like setting, this property offers seniors a quite repreve within the west end of Kitchener, Ontario. This property offered an opportunity to significantly lower utility/electrical costs within the common areas and in-suite units.


More

Picture

Siteline Group (149 Henry)
Goes Green

Located in the downtown core of Brantford ON, this property offered an opportunity to significantly lower utility/electrical costs within the common areas and in-suite units.
More

Picture

TRUTH IN NUMBERS: THE EFFORT TRUST COMPANY

MultiLogic recently retrofitted 36-buildings with LED upgrades, both in suite and common areas. This end-to-end project will produce annual savings of $600,000 per year with a payback of only 2.5 years, including over $480,000 in rebates from Horizon Utilities.  
MORE
Powered by Create your own unique website with customizable templates.
Follow us: